Article 80
I hope this message finds you well. Thank you very much for your time when we last met. The feedback from you have been incredibly valuable and significantly contributed to improving our system design, especially in how we explain the method. We truly appreciate your time.
I am happy to inform you that, thanks to the collaboration between Kairos and the Planning Department (Nupoor, Quinn and Kristiana), we have the fortunate opportunity to utilize the framework we presented for the internal city survey related to the current modernization effort of Article 80.
You may have already received communication from the Article 80 Action Team, but I wanted to remind you that the survey will be open until Nov 20th. If you were able to participate and input the survey already, we sincerely thank you for your time. If you haven’t yet, we kindly ask for your participation. Additionally, it would be greatly appreciated if you could share this survey with your colleagues and team members.
Please note that a detailed understanding of Article 80 is not required to complete the survey. It will take 15-20min https://article-80-survey.fly.dev/
Thank you once again for the help.
議題 ボストン市の建築申請プロセス改定
効果的な関与
開発におけるインプットの多様化
- 1A. オンライン調査などを通じて、プロジェクトについて学ぶ機会を増やし、フィードバックを提供しやすくする
- 1B. 現在の諮問グループを、既存の専門知識を維持しつつ、ボストンの多様性を代表する新しい構造であるコミュニティ・アドバイザリー・チーム(CAT)に置き換える
—
一貫した基準
都市のニーズをサポートするために、プロジェクトが緩和策と地域貢献を提供する方法に関する新しい基準を作成する
- 2A. 緩和策と地域貢献の新しい定義を作成する
- 2B. 交通・インフラおよびオープンスペース・公共空間の緩和策に対する 1 平方フィートあたりの明確なドル額ポリシーを確立する
- 2C. 最近の計画と地域貢献との強固な連携を構築する
- 2D. 提案者に対して、移転影響に関する新しい開示を提出することを要求する
—
調整されたレビュー
都市全体で透明で順序だった調整された承認プロセスを確立する
- 3A. 事前提出プロセスを公式化し、提出の順序を業界の慣行に合わせる
- 3B. 「コンセプト決定」を通じて重要な決定を確定し、不適切な提案に対して明確で早期の「ノー」を提供する
- 3C. 応答時間を更新し、遵守を強化する
- 3D. 部門間のポートフォリオレビューチームを作成し、データ駆動のパフォーマンス監視を強化する